Apne SNGPL ya SSGC bill ka estimate banate waqt billed/corrected hm³, GCV, category aur billing period match karein. Yeh conventional domestic schedule ka model hai. RLNG account, pressure correction, minimum bill, arrears aur har adjustment ka complete official bill nahi.

hm³ Se MMBtu: Isi Calculator Ka Formula
MMBtu = billed hm³ × GCV ÷ 281.7358. GCV 990 par 1 hm³ = 3.513930427 MMBtu, sirf 3.5 nahi. Calculation mein full precision rehti hai; displayed units aur rupees rounded hote hain. Rounded rows ko dobara multiply karne se chhota farq aa sakta hai.
SNGPL ki billing-method explanation is conversion ko document karti hai. Apne issued bill par formula/rounding different ho to usay official reconciliation mein priority dein. Raw meter m³ reading ko bina billed conversion/correction ke hm³ field mein na daalein.
Default Inputs Ki Independently Worked Example
Yeh tool ki dated table ki example hai, current tariff ya kisi household ki final liability ki certification nahi. Inputs: non-protected, billed consumption 1 hm³, GCV 990, GST 18%, extra charges zero.
| Step | Calculation / amount |
|---|---|
| Previous-slab quantity | 0.6 × 990 ÷ 281.7358 = 2.108358256 MMBtu |
| Previous-slab energy | 2.108358256 × Rs 850 ≈ Rs 1,792.10 |
| Remaining energy | 0.4 × 990 ÷ 281.7358 × Rs 1,250 ≈ Rs 1,756.97 |
| Gas cost | Rs 3,549.07 |
| Model fixed charge + rent | Rs 1,500 + Rs 40 |
| Before GST | Rs 5,089.07 |
| GST 18% | Rs 916.03 |
| Rounded model total | Rs 6,005 |
Purani Rs 5,989 example rounded 3.5 factor use karti thi. Is updated example mein result aur full-precision method aik hi hain. Yeh additional charges zero rakhne ki example hai; payable amount apne issued bill se match karein.
Company, Category Aur Unit Sahi Chunein
- Company select karein. Is conventional model mein SNGPL/SSGC selection common dataset use karti hai; har account type ko identical liability na samjhein.
- Protected/non-protected status apne bill aur applicable consumption-history rules se confirm karein. Sirf is mahine ki low consumption protected eligibility establish nahi karti.
- Bill ka corrected hm³ enter karein, ya MMBtu unit select karke billed MMBtu daalein. MMBtu mode mein GCV ka role conversion-back check mein hota hai.
- GST aur separate extra-charge inputs apne bill ki relevant lines se match karein. Extra field ko universal tax-base treatment na samjhein.
Result Mein Kya Included Hai?
Dated domestic slabs, configured fixed charge/rent aur entered GST ka estimate. Is model mein conventional one-preceding-slab benefit use hota hai; configured 4 hm³ threshold se upar top-rate treatment hai. Rate, threshold aur applicability ka latest official notification ya issued bill se check zaroor karein. Yeh page kisi future billing month ki unchanged prices ka wada nahi karta.
Estimate Aur Issued Bill Mein Farq Ho To
- Reading dates, actual/estimated reading aur corrected volume compare karein.
- Category, meter/load/account type aur RLNG status match karein.
- GCV, minimum-bill treatment, rent/fixed charge aur pressure factor dekhein.
- Arrears, GSD instalment, adjustments, due-date surcharge aur rounding alag reconcile karein.
Calculator ki difference se meter fault ya supplier overbilling automatically prove nahi hoti. OGRA aur apni company ki current instructions se applicable schedule confirm karein. Winter bill reconciliation guide period aur consumption ka comparison samjhati hai.