Construction Quote Comparison Kit Pakistan

Version 1.0 · 11 November 2026 · Methodology: Calculators33

Do quotations ke totals tab meaningful hain jab dono mein same kaam included ho. Ye kit contractor ki quoted amount mein missing allowances add karke same-scope totals banati hai. Market rate, contractor quality ya structural safety ka verdict nahi deti.

Compare karne se pehle ye details likhwa lein

Do ya teen quotes compare karein

Har item ke liye Included in base, Extra amount, Not needed ya Not clear select karein. Teesri quote optional hai. Area mein tamam floors ka covered area dein, plot size nahi. Extras ke liye written allowance ya apna clearly agreed budget use karein.

Same drawings, material specification aur work scope wali 2 ya 3 quotations compare karein. Base quote mein jo amount already included hai usay dobara add na karein.

Scope / amountQuote AQuote BQuote C (optional)
Base quoted total (Rs)
Material allowance
Labour
Finishing / fixtures
Approval fees
Boundary wall / gate
Utility connections
Contingency
Other excluded work

Numbers is browser mein process hotay hain. Page close ya reload karne se pehle worksheet download kar lein. Specifications aur contract ki professional review is comparison ka hissa nahi.

Misaal: sasti quote kab mehngi par sakti hai?

Quote A Rs 8,000,000 hai, lekin Rs 400,000 boundary wall aur Rs 200,000 approvals extra hain. Quote B Rs 8,400,000 hai aur dono included hain. Baqi scope equal aur complete ho to normalized A Rs 8,600,000 aur B Rs 8,400,000 hai. B Rs 200,000 kam hai. Agar A ke kisi aur item ka amount maloom nahi to usay Not clear rakhein, 0 na likhein.

Method aur limits

Same-scope total = base quoted total + sirf excluded items ke entered allowances. Included items dobara add nahi hotay. Per-square-foot amount = complete selected-scope total ÷ total covered area. Ranking tab dikhayi jati hai jab kam az kam do entered quotes ki tamam scope lines clear hon. Contingency bhi ek explicit rupee allowance hai, automatically koi percent add nahi hota.

Download ki hui CSV mein quoted base, each scope item, known total aur unknown item count hota hai. Ye browser mein banti hai. Contract sign karne se pehle drawings aur specifications qualified professional se review karwayein.

Initial construction budget se andaza lein. Comparison ka issue report karein.