The practical guide

Single Phase Vs Three Phase Meter: Bill Par Kya Farq Parta Hai?

Bohat se log samajhte hain ke three phase meter lagte hi bill zyada ho jaye ga, aur kuch samajhte hain ke three phase par bijli sasti parti hai. Dono baatein theek nahi hain. Seedha jawab yeh hai ke agar applicable tariff/category, units, load, demand, periods aur doosre charges same hon to energy/fixed components same ho sakte hain. Sirf units aur load same hona har case mein equal final bill ki guarantee nahi. NEPRA ke tariff mein ghar ka per unit rate phase dekh kar tay nahi hota. Rate units, protected ya non-protected status aur sanctioned load par tay hota hai. Asal farq is mein hai ke aap kitna load chala sakte hain, aur bare load par Time of Use yani TOU hisaab kab shuru hota hai.

Single phase aur three phase bijli ke meter aamne samne lage hue, dono ki wiring saaf nazar aa rahi hai

Single Phase Kya Hai?

Single phase supply mein bijli ek phase wire aur ek neutral wire se ghar tak aati hai. Pakistan mein aam ghar ki supply yahi hoti hai. Pankhe, lights, fridge, TV, washing machine aur ek aam size ka AC is par aaram se chalte hain. Is ki khubi is ki saadgi hai. Meter aam aur sasta hota hai aur wiring bhi aasan hoti hai. Chhote ghar aur kam load ke liye yahi connection munasib rehta hai.

Lekin sara load ek hi wire par parta hai, is liye kai bare appliances ek sath chal jayen to circuit rating, cable/connection sizing aur protection ki assessment zaroori ho sakti hai. Bari motor ya ek se zyada bare AC ek sath chalana hon to yeh supply kamzor par sakti hai. Yahi woh point hai jahan three phase ki zaroorat mehsoos hoti hai.

Three Phase Kya Hai?

Three phase supply mein bijli teen phase wires aur ek neutral wire se aati hai. Load teen wires par bant jata hai, is liye yeh supply zyada load asaani se utha sakti hai. Bare ghar aur motor wale kaam ke liye aam taur par yahi connection lagta hai.

Is ka pehla faida load balancing hai. Load munasib distribute ho to phase overloading kam ki ja sakti hai. Incoming voltage, cable sizing aur installation faults phir bhi affect karte hain; stable voltage ki guarantee nahi. Doosra faida motors ke liye hai. Kuch motors aur bare equipment three phase par hi chalne ke liye bane hote hain. Teesra faida yeh hai ke zyada load par bhi voltage drop kam hota hai, kyunke current teen wires mein bant jata hai. Lekin three phase ka matlab sasti bijli nahi hai, per unit rate is se tabdeel nahi hota.

Bill Par Farq — Same Tariff Aur Assumptions Zaroori Hain

NEPRA ke S.R.O. 279(I)/2026 ke tehet non-protected ghar ke slab rates yeh hain: 100 units tak Rs 22.44 per unit, 200 tak Rs 28.91, 300 tak Rs 33.10, 400 tak Rs 36.46, 500 tak Rs 38.95, 600 tak Rs 40.22, 700 tak Rs 41.85 aur 700 se zyada par Rs 47.20 per unit. Yeh rates dono phases ke liye ek hi hain. Tariff mein in ke samne phase ka koi alag column nahi hai.

Dated February 2026 non-TOU non-protected illustration: 300 units × Rs 33.10 = Rs 9,930 energy, aur assumed 2 kW × Rs 350 = Rs 700 fixed. Limited subtotal Rs 10,630. Agar dono connections par yahi eligible tariff, load aur consumption apply ho to ye components equal hain. FCA/QTA, taxes, duty, fees, arrears, credits aur account conditions is subtotal mein included nahi.

Ek chhoti wazahat: IESCO ki guide mein minimum charge single phase ke liye Rs 75 aur three phase ke liye Rs 150 likha hai, lekin jahan per kW fixed charge lage wahan yeh nahi lagta, is liye minimum customer charge aur per-kW fixed charge ko double count na karein. Phase-related minimum distinction ko “kabhi koi farq hi nahi” keh kar nazarandaz bhi na karein.

Apna hisaab aap khud bhi check kar sakte hain: Electricity Bill Calculator Pakistan aur Appliance Electricity Consumption Calculator

TOU Wala Farq — Asal Farq Yahan Hai

Ab woh hissa samjhein jahan bill waqai badal sakta hai. Tariff mein sanctioned load 5 kW ya is se zyada wale ghar Time of Use yani TOU rates par bill hote hain. TOU meter units ko peak hours aur off-peak hours mein alag ginata hai. February 2026 reference schedule ke peak Rs 46.85 aur off-peak Rs 34.53 per unit hain; current period aur peak timings apne provider se verify karein. In par fixed charge Rs 675 per kW lagta hai, jo sanctioned load ke 50 percent ya record zyada demand, jo bhi zyada ho, par banta hai.

TOU ka taluq seedha phase se nahi hai, sanctioned load se hai. Farq yeh hai ke 5 kW ya zyada load wale ghar aam taur par three phase TOU meter par hi hote hain. Is liye log samajh lete hain ke bill three phase ki wajah se badla, jabke asal wajah TOU hisaab hota hai.

Ek misal dekhein. Yeh misal sirf TOU ke units charge ke liye hai, is mein fixed charge, FCA, QTA aur GST shamil nahi hai. Farz karein wohi 300 units ek TOU connection par aaye hain, jin mein 100 units peak hours mein aur 200 units off-peak hours mein use hue hain. To units charge yeh bane ga: 100 × Rs 46.85 = Rs 4,685 aur 200 × Rs 34.53 = Rs 6,906, kul Rs 11,591. Slab wali misal mein units charge Rs 9,930 tha. Farq waqt ka hai, phase ka nahi.

Kis Ko Three Phase Lagwana Chahiye?

Agar ghar chhota hai aur load kam hai, to single phase hi kaafi hai. Bila wajah three phase lagwane se bill mein koi bachat nahi hogi, is liye extra kharche ki zaroorat nahi hai.

Three phase par jana tab munasib hai jab load waqai bara ho. Masalan ek se zyada bare AC ek sath chalte hon, bari motor ya water pump ka kaam ho, ya koi aisi machine ho jo three phase mangti ho. Aise mein three phase load distribution mein madad de sakta hai; stable voltage ya energy saving ki guarantee nahi. Faisla karne se pehle apne kul load ka andaza lazmi lagayein. Aur agar aap sirf is khayal se three phase lagwa rahe hain ke bill kam ho jaye ga, to ruk jayein. Bill kam karne ka sahi tareeqa units kam karna hai, aur TOU par hon to peak hours mein bhari load na chalana hai.

New Connection Par Farq

Naye connection ki qeemat mein phase ka farq parta hai, lekin bill ke rate mein nahi. Three phase connection mein meter, cable aur fitting ka samaan zyada lagta hai aur security bhi sanctioned load ke hisaab se banti hai, is liye is ka demand notice aam taur par single phase se zyada banta hai. Single phase se three phase par jane ke liye load barhane ki darkhwast aur naya demand notice bhi lag sakta hai.

Yahan koi pakki rakam likhna theek nahi hoga, kyunke har DISCO mein cable ki lambai aur load ke hisaab se rakam alag banti hai. Hatami rakam hamesha company ke demand notice par hi likhi hoti hai, is liye darkhwast se pehle apni DISCO se current schedule confirm kar lein.

Aksar Poochay Jane Walay Sawalaat (FAQs)

Sawal: Kya three phase meter lagwane se bill zyada aata hai?

Jawab: Phase akela final amount decide nahi karta. Applicable tariff/category, load, TOU timings, demand aur saari bill lines compare karein. Same-assumption energy/fixed example Rs 10,630 subtotal hai, universal final bill nahi.

Sawal: Kya three phase par per unit rate sasta hota hai?

Jawab: Nahi. Non-protected slab rates dono phases ke liye ek hi hain, 100 units par Rs 22.44 se lekar 700 se zyada par Rs 47.20 per unit tak. Three phase par koi alag slab nahi milta.

Sawal: TOU meter kis ko lagta hai aur is se bill par kya asar parta hai?

Jawab: Sanctioned load 5 kW ya is se zyada wale ghar TOU rates par bill hote hain, aur yeh connections aam taur par three phase par hote hain. Peak units Rs 46.85 aur off-peak units Rs 34.53 per unit lagte hain, is liye bill istemal ke waqt par depend karta hai.

Sawal: Kya mein apna single phase meter three phase mein tabdeel karwa sakta hun?

Jawab: Ji haan, aap apni DISCO ko load barhane ki darkhwast de sakte hain. Company survey ke baad demand notice jaari karti hai, jis mein meter aur security ke charges hote hain. Pehle soch lein ke load ko is ki asal zaroorat hai bhi ya nahi, kyunke is se bill mein koi bachat nahi hogi.

Note: Is article ke rates NEPRA ke S.R.O. 279(I)/2026 aur IESCO ki official Tariff Guide par mabni hain. Unverified month-specific full-bill totals hata diye gaye hain; example energy-plus-fixed subtotal hai. Naye connection ki hatami rakam ke liye apna demand notice hi dekhein.

Primary tariff reference: IESCO dated SRO 279(I)/2026 tariff guide, including fixed/minimum and TOU demand notes. Targeted comparison checked 13 November 2026. Wiring/load-balancing design qualified electrician aur approved load assessment ka kaam hai.